• 75000kg Tower Crane Mast Section Tower Crane Light
  • 75000kg Tower Crane Mast Section Tower Crane Light
  • 75000kg Tower Crane Mast Section Tower Crane Light
  • 75000kg Tower Crane Mast Section Tower Crane Light
  • 75000kg Tower Crane Mast Section Tower Crane Light
  • 75000kg Tower Crane Mast Section Tower Crane Light

75000kg Tower Crane Mast Section Tower Crane Light

Certification: CE, ISO9001
Condition: New
Maximum Lifting Height: 200-250m
Maximum Lifting Weight: >10t
Installation: Overall Rapid Disassembly
Moving Type: Fixed
Samples:
US$ 200/Piece 1 Piece(Min.Order)
| Request Sample
Customization:

Contact Supplier

Diamond Member Since 2010

Suppliers with verified business licenses

Trading Company

Basic Info.

Model NO.
Sinomada Tower Crane
Type
Top-Slewing Crane
Total Power
22kw
Transport Package
Container/Roro/Bulk
Specification
100 Ton
Trademark
Sinomada
Origin
China
HS Code
8426200000
Production Capacity
500unit/Month

Product Description

75000Kg Tower Crane Mast Section tower crane light
 

Tower crane is one of the most commonly lifting equipment in construction site, also known as "tower crane". It is to hang construction materials such as steel bar, corrugated, concrete, steel pipe, etc. by connecting section by section (referred to as "standard section"). Tower crane is an indispensable equipment on the construction site.

The function of the tower crane tip is to bear the upper load from the boom pulling rope and the balancing arm pulling rope, and to transfer directly to the tower body structure through the rotary tower, turntable, bearing and other structural components. The top of the self elevating tower has a truncated cone column, a forward or backward inclined truncated cone column, a herringbone frame and a diagonal bracing frame. The balancing weight is required for all the upper rotary tower cranes, whose function is to support the balancing weight to form the balancing moment opposite to the direction of the lifting moment required in the design. In addition to the counterweight, the lifting mechanism is often installed at its rear end. The reason why the lifting mechanism is placed at the end of the balancing arm together with the balancing weight is that it can play a part of the counterweight role, and increase the distance between the rope drum and the spire guide wheel, so as to facilitate the winding of the wire rope and avoid the occurrence of rope disorder.

 

Parameters

item parameters unit
Total Power 22 kw
Max. Height 135.7 m
Arm length 40 m
Tip Load 1.5 t
Maximum lifting capacity 2.9 t
The tower is a standard section 1.6*1.6*3.0 m
Rope volume 400 m
Independent height 39.7 m
Gyration speed  0-0.6 r/min


75000kg Tower Crane Mast Section Tower Crane Light
 

Send your message to this supplier

*From:
*To:
avatar Ms. Sinomada
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now